Ready Set Reline are relining specialists carrying out commercial pipe relining across Sydney, on offices, warehouses, retail sites and complexes that can’t afford to close. Ryan trained on-site at the Brawoliner factory in Germany, and every UV reline is installed to the Plumbing Code of Australia (PCA) using WaterMark-approved materials that meet AS/NZS 3500. Your facilities or site manager deals directly with the crew doing the work, never a subcontractor.

What is it?
Relining for buildings that can’t shut down
Commercial pipe relining fixes cracked, leaking or root-damaged sewer and stormwater pipes under offices, warehouses, retail sites and complexes without digging. A resin liner is cured inside the old pipe to form a new jointless pipe, so floors, car parks and footpaths stay intact.
On a commercial job the pipe is rarely the hard part. The hard part is everything around it, tenants who need their toilets, a loading dock that can’t be blocked, a street that can’t be closed, cooling towers and stormwater that have to keep running. Excavation turns a drain fault into weeks of disruption and a reinstatement bill. Relining usually gets the pipe fixed in one shift.
We reline sewer and stormwater for facilities managers, property owners, builders and site managers across Sydney, on offices, warehouses, retail sites, clubs and commercial complexes.

Recent Commercial Relining Jobs
| Site | Pipe | Length | Method | Result |
|---|---|---|---|---|
| Bunnings warehouse (new build) | 100mm (4″) PVC sewer | 25m | Full reline, open junctions capped | Done in 1 day |
| Office block, Sydney CBD | 375mm fibro-cement stormwater | 12m | UV-cured liner | All leaking joints sealed |
| Commercial complex, Brookvale | 150mm clay sewer | 55m | Two-part epoxy liner | Roots sealed out, surcharging stopped |
Step-by-Step
How a commercial reline runs
CCTV inspection
We run a CCTV inspection to find the fault, its cause and exactly where it is. You get the footage, so you can show your board, owner or builder what we saw.
Plan around your operation
Before anyone turns up, we agree the work window with you: after hours or weekends, which fixtures, stormwater or plant need to come offline, how flows get diverted, and how we get equipment in through lifts, loading docks or footpaths.
Clean and prepare
High-pressure jetting clears grease, silt and debris, and robotic cutting removes hard obstructions so the liner has a sound surface to bond to.
Reline
The liner goes in through an existing access point and is cured in place, forming a new jointless pipe inside the old one. Liners are WaterMark certified and installed to AS/NZS 3500 Plumbing and Drainage.
Reopen or cap the junctions
Branch lines that need to stay live are reinstated with a robotic cutter. Open or redundant ones are capped off.
Final CCTV inspection and handover
A second CCTV run confirms the cure and the flow. That footage goes to you as a record for your maintenance file.
Matching the liner to the pipe
There is no single commercial method. The pipe size, material, length and the window you can give us decide which system we use.
| Situation | What we use | Why |
|---|---|---|
| Large-diameter stormwater, vertical stacks, tight shutdown windows | UV pipe relining | The glass-fibre liner cures on demand under UV light, so the install is controlled and the line is back in service quickly. |
| Long sewer runs with root intrusion through old joints | Two-part epoxy liner | Seals the full run as one jointless pipe, so roots have no joint to get through. |
| One cracked or displaced section | Pipe patch relining | Seals only the damaged length instead of the whole line. |
| A failed connection where a branch meets the main | Satellite junction repair | Seals the junction itself, where relining the main alone would leave it open. |
On commercial sites we reline PVC (including defective new-build pipe), vitrified clay, fibro-cement, cast iron and concrete, from 100mm sewer up to 375mm stormwater.

What sets the price on a commercial job
Commercial relining is quoted per site, because the conditions you need us to work under matter as much as the pipe. The price comes down to:
Some rough pricing estimates for 100mm and 150mm lines are on the pipe relining cost page. Larger diameters are quoted after we’ve had a camera through the line. Got a written quote from someone else? We’ll beat any comparable written quote by 10%.
Service Area
Suburbs we serve across Sydney
Ready Set Reline is based in Roseville and delivers pipe relining services right across Sydney. We work daily through the North Shore, Lower North Shore, Northern Beaches, Eastern Suburbs, Inner West, Hills District and the CBD.
These are exactly the areas where pipe relining earns its keep. Sydney’s established suburbs are full of pre-war homes on leafy streets, where original earthenware and clay drains sit under mature trees, heritage gardens and paved driveways. Digging is expensive and often restricted, relining from the inside is not.