This one-day project in Gordon, NSW, involved addressing severe leakage in a 375mm concrete stormwater pipe running alongside a multi-unit building. The pipe had cracked and partially collapsed, allowing water to escape into the surrounding ground. Our team was engaged to provide a non-invasive, long-term pipe rehabilitation solution using advanced relining technology — all without excavation or disruption to residents.
The client’s goal was clear: Pipe Repair and Pipe Reline 25 metres of 375mm stormwater pipework, permanently sealing every leaking joint and restoring the pipe’s full structural integrity. Using fibreglass liner and UV resin technology, Ready Set Reline was chosen to deliver a fast, reliable, and lasting result — all within a single day.
Our method combined precision, safety, and efficiency — ensuring a seamless one-day turnaround while delivering a high-quality, long-lasting result.
Site Assessment & Consultation
We first inspected the entire plumbing layout to identify problem areas and where we could access the pipes.We first inspected the entire plumbing layout to identify problem areas and where we could access the pipes.
CCTV Pipe Inspection
Using high-resolution cameras, we carefully examined the pipes to find the exact location and extent of the damage. This step gave us a clear picture before any work began.
Pipe Cleaning & Preparation
Next, we cleaned the pipes using high-pressure water jetting to remove any debris and buildup. This made sure the surface was ready for the lining to stick properly.
Pipe Relining Installation
We inserted a resin-coated liner trenchlessly into the damaged pipes. Depending on the method, the liner was cured with ambient heat, hot water, or UV light to harden and restore the pipes.
Post-Relining Inspection
Once the lining was done, we did a final CCTV pipe inspection to ensure the lining was installed correctly and that water flow was clear.
Reporting & Documentation
We provided before-and-after video footage and a detailed report of the work performed, showing the condition of the pipes and the repairs made.
Cleanup & Site Restoration
Finally, we removed all equipment and restored any disturbed areas to leave the site neat and tidy.
Working in a busy residential complex required careful coordination and planning.
Our team had to manage restricted site access, as the driveway and garage entry needed to remain open throughout the works. Despite these challenges, we successfully executed the relining without interrupting the daily routines of building occupants.
50-year warranty on the superior liner used.
Delivered a permanent, non-invasive solution with zero excavation.
Provided complimentary annual CCTV inspections for 2 years post-project to ensure continued performance.
Work completed entirely by our in-house Ready Set Reline specialists, trained directly by experts in Germany.
Despite access constraints, the project was completed on time and within a single day, without excavation or disruption to the residents. Our client was highly satisfied with the efficiency and quality of the work — and the assurance of a lasting solution backed by warranty and aftercare.